Agencies
|
Online Services
|
Policies
Back
|
Top of Page
|
Return to Plan Index Page
|
Return to Engineering Home
Faulkner
- Plans ordered by the date received
Received: 12/1/2008 - LANGLEY TRAILER PARK SEWER IMPROVEMENTS, FAULKNER CO AR. TWO SETS OF PLANS/SPEC SUBMITTED, $290.25 FEE PD
Received: 11/13/2008 - UCA ALUMNI HOUSE WATER AND SEWER IMPROVEMENTS, CONWAY AR. TWO SETS OF PLANS SUBMITTED, $500.00 FEE PD
Received: 11/4/2008 - WOLFBRANCH WATERLINE EXTENSION, GUY AR. TWO SETS OF PLANS SUBMITTED, $85.00 FEE PD SEPTIC FEES PAID UNDER PROJECT 69403
Received: 11/4/2008 - TILLMAN PROPERTY WATERLINE EXTENSION GUY AR. TWO SETS OF PLANS SUBMITTED, $75.00 FEE PD
Received: 11/3/2008 - GARDENS AT SOUTHRIDGE SUBDIVISION WATER AND SANITARY SEWER IMPROVEMENTS, CONWAY AR. TWO SETS OF PLANS SUBMITTED, NO FEE PD
Received: 11/3/2008 - HENDRIX VILLAGE FIRE PROTECTION PLANS, CONWAY AR. SIX SETS OF PLANS SUBMITTED, $50.00 FEE PD
Received: 10/31/2008 - COUNTRY INN AND SUITES FIRE PROTECTION PLANS, CONWAY AR. THREE COPIES OF PLANS SUBMITTED, NO FEE PD
Received: 10/20/2008 - CITY OF GREENBRIER 500,000 GAL STORAGE TANK PRELIMINARY ENG REPORT. ONE SUBMITTED, NO FEE REQUIRED
Received: 10/10/2008 - MORGAN TOWN VALLEY ESTATES SUBDIVISION SOIL INTERPRETATIONS, FAULKNER CO AR. ONE PLAN SUBMITTED, $300.00 FEE PD
Received: 10/8/2008 - WOLF RUN MOBILE HOME PARK SOIL INVESTIGATION, FAULKNER CO AR. ONE SET OF PLANS SUBMITTED, $25.00 FEE PD SEPTIC PLANS FOR WATERLINE PROJECT 69730
Received: 9/16/2008 - WILHELMINA COVE SUBDIVISION COLLECTION AND TREATMENT FACILITY, FAULKNER CO AR. TWO SET OF PLANS/SPEC SUBMITTED, $157.19 FEE PD
Received: 9/8/2008 - SHEPPARD'S CREEK PHASE II WATER IMPROVEMENTS, CONWAY AR. TWO SETS OF PLANS SUBMITTED, $500.00 FEE PD
Received: 8/27/2008 - THE GREENS AT NUTTER'S CHAPEL WATER AND SEWER IMPROVEMENTS, CONWAY AR. TWO SETS OF PLANS/SPEC SUBMITTED, $500.00 FEE PD
Received: 8/27/2008 - ROCK CREEK OF CONWAY WATER AND SEWER IMPROVEMENTS. TWO SETS OF PLANS SUBMITTED, $500.00 FEE PD
Received: 8/27/2008 - COVINGTON INDUSTRIAL PARK DEVELOPMENT WATER AND SEWER IMPROVEMENTS, CONWAY AR. TWO SETS OF PLANS SUBMITTED, $500.00 FEE PD
Received: 8/18/2008 - STONEGATE APARTMENTS WATER AND SEWER MAIN EXTENSION, CONWAY AR. TWO SETS OF PLANS SUBMITTED, $500.00 FEE PD
Received: 8/4/2008 - ALEXANDRA PLACE APTS. WATER AND SEWER EXTENSION **500 PD** ENGINEERING DISTRICT 9 FAULKNER CONWAY WATER & SEWER IMPRVMN(NON-SUB) DAVID HALL
Received: 7/25/2008 - CONWAY CORPORATION WATER TREATMENT PLANT FLOURIDE RELOCATION.TWO SETS OF PLANS/SPEC SUBMITTED, $500.00 FEE PD
Received: 7/24/2008 - UCA PROPOSED BUSINESS BUILDING WATER AND SEWER EXTENSION. THREE COPIES OF PLANS SUBMITTED, $190.00 FEE PD
Received: 7/8/2008 - HWY 89 W WATERLINE EXTENSIONS PROJECT, FAULKNER CO AR. TWO SETS OF PLANS/SPEC SUBMITTED, $500.00 FEE PD. PREVIOUSLY APPROVED UNDER ADH#51624.
Received: 7/1/2008 - DEARASAUGH MOBILE HOME PARK, CONWAY AR, WATER AND SEWER IMPROVEMENTS. ONE SET OF PLANS SUBMITTED, $85.00 PD FOR WATER/SEWER, $25.00 FOR MOBILE HOME FEE.
Received: 6/17/2008 - CRESTLAWN MEMORIAL PARK ADDTNL MAUSOLEUM, CONWAY AR. ONE SET OF PLANS SUBMITTED, $50.00 FEE PD
Received: 6/13/2008 - HARRINGTON AND REYNOLDS SUBDIVISION WATER AND SEWER EXTENSION. TWO SETS OF PLANS /SPEC SUBMITTED, $500.00 FEE PD. PREVIOUSLY APPROVED UNDER ADH#46660
Received: 6/3/2008 - SUNSET RIDGE SUBDIVISION SOIL INTERPRETATIONS, FAULKNER CO AR. ONE PLAN SUBMITTED, $425.00 FEE PD
Received: 6/2/2008 - SUMMER HILL PLACE SUBDIVISION AS BUILT DRAWINGS. ONE SET SUBMITTED, $50.00 FEE PD
Received: 4/8/2008 - HENDRIX COLLEGE STUDENT LIFE AND TECH CTR BACKFLOW PREVENTOR PLANS. FIVE SETS PLANS SUBMITTED, $50.00 FEE PD
Received: 3/10/2008 - STORAGE TANK PAINTING. (JEFF GREEN-LEHER PAINTING ENTERPRISES) THREE SETS OF SPECIFICATIONS SUBMITTED, NO FEES REQUIRED
Received: 12/5/2007 - PROPOSED TACO BUENO RESTAURANT, CORNER OF DAVE WARD DR&SOUTH GERMAN LN. TWO SETS OF PLANS/SPECIFICATIONS,$500.00 FEE PD. (THE ROBERTS GROUP PSC)
Received: 10/18/2007 - BELL - FOX SUBDIVISION **200 PD** ENGINEERING DISTRICT 9 FAULKNER WATER & SEWER IMPRVMN(NON-SUB) TIM TYLER
Back
|
Top of Page
|
Return to Plan Index Page
|
Return to Engineering Home